MANILA, Philippines — The Energy Regulatory Commission (ERC) announced that it has issued the 2025 Amended Rules Enabling the Net-Metering Program for Renewable Energy.
ERC amends net-metering rules to expand renewable energy options
The regulator said this development aimed to streamline the implementation of the net-metering program and make renewable energy (RE) adoption more accessible to qualified end-users.
ERC amends net-metering rules to expand renewable energy options
Following a series of public consultations and careful review of stakeholders’ inputs, the ERC issued Resolution 15, Series of 2025, introducing key amendments aimed at strengthening consumer protection and simplifying processes for availing of the program.
As per the ERC, one of the key amendments permits the banking and rollover of net-metering credits toward a qualified end-user's electricity usage across current and future billing periods., This news data comes from:http://www.gyglfs.com
It added that in the event of a property ownership change, the credits may be transferred to the new owner, subject to conditions such as a conforme letter from the original owner.
Net-metering allows customers of distribution utilities to install an on-site Renewable Energy (RE) facility not exceeding 100 kilowatts (kW) in capacity so they can generate electricity for their own use.

In turn, any electricity generated that is not consumed by the customer is automatically exported to the distribution utility's’s distribution system.
- Immigration: 1st lookout bulletin in effect on 35 individuals, including Discayas, linked to anomalous flood control projects
- North Korea's Kim in China ahead of massive military parade
- Venezuela deploys warships, drones as US destroyers draw near
- House tackles P881B public works budget amid flood control anomalies
- No winner in lotto draws for Aug 23
- PNP chief Torre relieved, Nartatez to take over
- Workers urge Marcos to stop corruption by banning political dynasties
- Kilauea's eruption is back as the Hawaii volcano shoots lava for the 31st time since December
- DPWH exec fired, 2 others face dismissal over flood control mess
- LPA trough, 'habagat' to bring rains in parts of Luzon, including Metro Manila